Homepage  >  Industrial news  >  It is important to strike at the confluence of rain and sewage and promote the construction of green water conservancy.

It is important to strike at the confluence of rain and sewage and promote the construction of green water conservancy.

Hits:803 Createtime:2022-08-12 10:30:59

The black and smelly water body is a water body that presents unpleasant color and emits unpleasant odor. The odor of the water body is due to the odor generated by domestic sewage washing clothes / toilet water. The black water body is due to the deposition of pollutants, and the water itself is not black. According to the test data, the water quality standard for mild black odor is that the ammonia nitrogen content in water exceeds 7Mg / L.

According to the research results of CMRC's National Research Report on the treatment of black and smelly water bodies, there are three main ways to form black and smelly water bodies: first, the domestic sewage caused by the direct discharge of sewage, the confluence of rain and sewage or the damage of urban pipe network enters the river channel through the city to form black and smelly water bodies; The second is that the residents throw the garbage at random, polluting the river, or the garbage piles are washed by the rain to form a black and smelly water body; The third is the phenomenon of dead water and dead lake caused by the slow flow rate of the water body, forming a black and smelly water body.

Before 2015, the government paid less attention to the treatment of black and odorous water bodies. In 2015, the state began to pay attention to the water environment quality, issued the action plan for water pollution prevention and control and the "ten water items", and proposed for the first time that the number of black and odorous water bodies should be used as an indicator to measure the water environment quality. It is required that by 2030, the black and odorous water bodies in urban built-up areas should be generally eliminated. Therefore, the treatment of black and odorous water bodies in urban built-up areas has been started. Local government departments have successively issued work guidelines, guiding opinions, implementation plans and other policies on the treatment of black and odorous water bodies in urban and rural areas. From 2016 to 2018, the relevant policies on the treatment of black and odorous water bodies in urban built-up areas were mainly released. From 2019, the relevant policies on the treatment of black and odorous water bodies in rural areas were successively released.

1

Fig. 1 national policy analysis of black and odorous water treatment industry

As an important measure to solve the problem of black and smelly water bodies, rain and sewage confluence transformation has been carried out in various places. However, due to the early construction of some cities, the housing construction does not support the large-scale rainwater and sewage confluence reconstruction project, and the branch pipe to household cannot be realized. Therefore, before the housing reconstruction, the intercepting well product is the best method for the municipal pipe network reconstruction.

The intercepting well products are divided into two categories: traditional intercepting well (including pressure gate intercepting well) and integrated intercepting well. Compared with traditional intercepting well, the integrated intercepting well uses metering components such as rain gauge and liquid level gauge to control the opening and closing of the intercepting valve, which can achieve better diversion effect, but also has the disadvantages of high cost and short service life. Therefore, the market opportunities of the integrated intercepting well are mainly concentrated in the sewage direct outlets on both sides of the river that need to control the opening and closing of the intercepting valve in the sunny and rainy seasons, and the part where the pipe diameter at the end of the reconstruction of the rainwater and sewage confluence pipeline is dn600-dn1000. The construction of the integrated intercepting well is simpler than the pressure gate intercepting well. Meanwhile, the water flow is large, and there are higher requirements for the measuring components such as the rain gauge and the liquid level gauge, The application of integrated shut-off well can achieve better diversion effect.

2

Fig. 2 Comparison and analysis of products of traditional intercepting well and integrated intercepting well

From the current market application situation, the proportion of rainwater and sewage confluence that cannot be treated by branch pipes to households and needs to be treated by intercepting well equipment exceeds 75%, of which the use of integrated intercepting wells accounts for about 10%. The government has made great efforts to renovate the confluence of rain and sewage and promote the construction of green water conservancy projects. The intercepting well is indispensable. As a new intelligent product, the integrated intercepting well will develop steadily in the future.